Product Parameters
| Product Specification |
Remark |
| Description |
Solar Underground Road Stud (S.S & aluminum) |
|
| Model Number |
JY-DDJY1-D55X |
| Product Dimension |
D55(70) * H60 mm |
| Power |
Material |
Mono-crystalline silicon solar cell,80mA |
| Voltage |
2.5V |
| Battery |
Hi-Temp NI-MH battery,1.2V,1200 mAh |
| LED |
Quantity |
4 pcs |
| Color |
Red/white/yellow/green/blue/amber |
| Frequency |
2Hz±20% or continual light |
| Visible Distance |
>800 m |
| Working Time |
72h after fully charged (flash) |
| Light Intensity |
8000~10000 mcd |
| Starting Light Intensity |
<500 Lux |
| Main Material |
Stain steel / Aluminum alloy |
| Lifespan |
3 Years |
| Working Temperature |
-20-60 ºC |
| Resist Compression |
Up to 15 ton (statics) |
| Ingress Protection |
IP68 |
| Net Weight |
280 g |
| Packing |
36 pcs/carton /30*23*23cm |
Company Profile
Movever Industrial located in Shenzhen, China, which is specializing in roadway safety products & luminous lighting product design service and manufacturing.
We keep learning forever, moving forever, Let's serve for you to be a comprehensive traffic safety, LED lighting solution provider.
we have below products range:
>Traffic road stud.
>Traffic warning / flashing light
>Traffic signage
>Traffic signal light
>Traffic controller
>Traffic reflective material
>Mobile traffic signal light
>LED street light

Trade Terms & Payment
- EXW, FOB, CFR, CIF is optional for your choice.
- Telegraphic Transfer (T/T), Letter of Credit, WU, PayPal are accepted.
Management system
Production control

FAQ
Question A: How do you control product quality?
>Answer: We have IQC did random inspection and test when raw material was coming,
IPQC did inspection and test of electronic performance for each production line,
FQC did 100% full inspection for appearance & function before packing,
OQC did random inspection as per latest AQL standard.
Question B: What is your minimum order quantity and production lead time?
>Answer: For all modes, we provide sample or sample order, take 3~5 days,
for mass order, average lead time is 7~10 working days.
for glass road block mass order, average lead time is 25~30 working days.
Question C: How to control the delivery products are we need?
>Answer: We will take picture for appearance & package and video for functions test for your approval before delivery.
Question D: What is your after-sale services?
>Answer: We will replace it free in guarantee period.
Why choose US?
- We have professional R & D team.
- We have high efficiency management system,
- Experienced process standard to different countries (North America, Europe, Australia, Africa,etc.)
- We have workshop to control production speed and product quality, and more than 9 years solid manufacturing experiences.
Application