Customization: | Available |
---|---|
Type: | Solar Road Stud |
Application: | Road |
Still deciding? Get samples of US$ 5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Specification | Remark | |||
Description | Solar Road Stud (square shape) | 2 size | ||
Model Number | JY-DDJF1-13 / 23-X (New: JY-DDJFN-13 / 23-X) | |||
Product Dimension | 104*104*23 mm (New mode size: 114 x 110 x 23 mm) | |||
Power | Material | Mono-crystalline silicon solar cell,100mA | ||
Voltage | 2V | |||
Output max consumption | 0.2W | |||
Battery | Hi-Temp NI-MH battery,1.2V,600 mAh | |||
LED | Quantity | 2 / 3 pcs per side | ||
Color | Red/white/yellow/green/blue | |||
Frequency | 2Hz±20% flash or steady light | |||
Visible Distance | >800 m | |||
Working Time | 100h after fully charged (flash) | |||
Light Intensity | 6000~10000 mcd | |||
Starting Light Intensity | <500 Lux | |||
Main Material | Aluminum alloy | |||
Lifespan | 3 Year | |||
Working Temperature | -20-60 ºC | |||
Resist Compression | Up to 15 ton (statics) | |||
Ingress Protection | IP67 | |||
Net Weight | 320 g | |||
Packing | 60 pcs/carton / 39 x 29 x 27 cm |
Production & Testing
MovEver Industrial located in Shenzhen, China, which is specializing in roadway safety products & luminous lighting product design service and manufacturing.
We keep learning forever, moving forever, Let's serve for you to be a comprehensive traffic safety, LED lighting solution provider.
we have below products range:
Question A: How do you control product quality?
>Answer: We have IQC did random inspection and test when raw material was coming,
IPQC did inspection and test of electronic performance for each production line,
FQC did 100% full inspection for appearance & function before packing,
OQC did random inspection as per latest AQL standard.
Question B: What is your minimum order quantity and production lead time?
>Answer: For all modes, we provide sample or sample order, take 3~5 days,
for mass order, average lead time is 7~10 working days.
for glass road block mass order, average lead time is 25~30 working days.
Question C: How to control the delivery products are we need?
>Answer: We will take picture for appearance & package and video for functions test for your approval before delivery.
Question D: What is your after-sale services?
>Answer: We will replace it free in guarantee period.