Customization: | Available |
---|---|
Type: | Direction Indicator Light |
Application: | Road Construction, Railway, Parking, Road |
Still deciding? Get samples of US$ 80/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Specification | Remark | |||
Description | Solar Traffic Sign (signage) | 2 types solar panel fixture (embedded / external) | ||
Model Number | JY-BZPS-XX | |||
Product Dimension | 400*600,600*800,300*1200 mm or customized | |||
Power | Material | mono-crystalline silicon solar cell | ||
Voltage | 12 V | |||
Output max consumption | 3 /5 W | |||
Battery | Lithium battery,7.4V&6.6Ah / 11.1V&5 Ah | |||
LED | Color | yellow / red / green / white | ||
Working Mode | Automatic 12 or 24 hours | |||
Visible Distance | >800 m | |||
Working Time | 100h after fully charged (flash) | |||
Light Intensity | 6000~10000 mcd | |||
Main Material | Aluminum /reflective film | |||
Lifespan | 3 Year | |||
Working Temperature | -20-60 ºC | |||
Ingress Protection | IP65 | |||
Net Weight | 6.5 /9.5 kg | |||
Packing | 1 pc/carton |
Production & Testing
MovEver Industrial located in Shenzhen, China, which is specializing in roadway safety products & luminous lighting product design service and manufacturing.
We keep learning forever, moving forever, Let's serve for you to be a comprehensive traffic safety, LED lighting solution provider.
we have below products range:
Production control
Question A: How do you control product quality?
>Answer: We have IQC did random inspection and test when raw material was coming,
IPQC did inspection and test of electronic performance for each production line,
FQC did 100% full inspection for appearance & function before packing,
OQC did random inspection as per latest AQL standard.
Question B: What is your minimum order quantity and production lead time?
>Answer: For all modes, we provide sample or sample order, take 3~5 days,
for mass order, average lead time is 7~10 working days.
for glass road block mass order, average lead time is 25~30 working days.
Question C: How to control the delivery products are we need?
>Answer: We will take picture for appearance & package and video for functions test for your approval before delivery.
Question D: What is your after-sale services?
>Answer: We will replace it free in guarantee period.